Set Out Survey Explained: Stages, Process, and Costs in Sydney 

Survey team using a theodolite and construction plans for a set out survey, with civil engineers taking measurements on a road construction site.

Table of Contents

Building projects move fast once the builder is ready. A set out survey helps by taking what’s shown on your construction drawings and marking it clearly on the ground, so excavation and structural work can start with the right reference points in place.

What Is a Set Out Survey (And What Does “Set-Out” Mean in Construction)?

In construction, “set-out” means laying out where something will be built, based on the nominated plans. It is the step that turns lines and dimensions on drawings into physical marks on the site that the builder can work from.

You may also hear it called a construction set out survey, building set out survey, house set out survey, or site set out survey. They all refer to the same idea: marking the building footprint (and related control points) so construction starts in the correct position.

Survey set-out vs set out plan: what’s the difference?

  • A set out plan is the drawing information that shows what needs to be marked, such as corners, wall lines, gridlines, and offsets.

  • A survey set-out is the on-site work where the surveyor marks those locations and confirms they align with the nominated plans.

Why Setting Out Matters on Sydney Builds

Sydney sites are often constrained. Blocks can be narrow, sloping, or close to neighbours, and approvals may include strict setbacks and other conditions. A proper set-out creates clear points the builder and trades can consistently work from as the site changes through excavation, footings, and slab work.

Common site issues set-out helps prevent

  • The building footprint being positioned too close to a boundary or setback line.

  • Confusion between trades due to inconsistent reference points.

  • Site changes during excavation removing the original reference marks.

A quick note on boundaries

If boundary pegs are missing, fences look out of line, or you are building close to a boundary, it can be worth discussing a boundary re-establishment survey before construction progresses too far.

If you want to see how different survey types fit into the overall process, the East West Surveyors Services page is a useful starting point.

How a Construction Set Out Survey Works on Site

A construction set out survey is a measured process. The surveyor uses reliable control points and surveying equipment to mark the nominated building position so it can be built as designed.

What the surveyor typically needs from you

  • The latest construction-ready plans, including a site plan with key dimensions.

  • Confirmation from the builder on what stage is next (footings, slab, walls, or other).

  • Site access details and any safety or induction requirements.

What gets marked on site

Depending on the stage and design, the marks often include:

  • Building corners and/or key wall lines.

  • Offset marks or offset pegs that remain usable after excavation.

  • Gridlines or control lines where the structural layout calls for them.

  • A benchmark or level reference when height control is included in the scope.

Set-Out Stages at a Glance

Set-out is often done in stages, because the site changes quickly once excavation starts. Your builder will usually advise what they need next, and the set-out can be planned around that sequence.

Typical set-out stages and their purpose

Set-out StageWhat Gets Marked on SiteWhy It Matters
Pre-excavation / footing set-outFootprint corners, wall lines or gridlines, offsets, and reference marks.Supports excavation and footing placement in the correct location.
Slab set-out (if required)Slab edges, key wall lines, and offsets that remain useful after excavation.Helps formwork and concreting teams line up the slab correctly.
Ongoing / check set-outs (project-dependent)Additional points for structural elements as the job progresses.Keeps the build aligned as new elements are installed.

Set-Out Methods People Mention (Including 3-4-5)

You may hear builders reference methods like 3-4-5 to check squareness. The 3-4-5 method uses a triangle with side lengths in the ratio 3, 4, and 5 to form a right angle.

It is a useful concept on site. But a survey set-out is broader than that. It focuses on the nominated building position, the correct orientation, and clear marks that remain practical as the site changes.

House Set Out Survey vs Duplex and Small Developments

Single dwellings often have a straightforward footprint. Duplexes and small developments can involve more corners, tighter interfaces, and more constraints, which can increase the set-out scope and the number of points required on site.

Renovations and additions can also need extra attention, because new work often has to tie neatly into existing structures.

Set Out Survey Cost in Sydney: What Influences Pricing?

Set out survey cost depends on site conditions, the complexity of the footprint, and whether you need one visit or multiple set-out stages. The most accurate way to price it is to quote against your current plans and your build stage.

Cost factors at a glance

Cost FactorWhat It AffectsWhy It Matters
Footprint complexityTime on site and number of points to mark.More corners and angles take longer to set out and confirm.
Site access and conditionSetup time and practicality of marking.Tight, steep, or obstructed sites can require extra time.
Number of stages / visitsTotal scope across the build.A staged set-out involves separate visits and re-establishment of control.
Plan clarity and revisionsPotential rework.Set-out must reflect the latest approved/construction plans.

How to get a fast, accurate quote

Send through your latest plans and confirm your stage, such as footings, slab, or an addition. That lets the quote match what the builder actually needs on site.

If you want broader context, the East West Surveyors land survey cost blog explains common pricing drivers across different survey types.

What East West Surveyors Typically Includes in a Set-Out Survey

Inclusions vary by project and stage, but a typical set-out is designed to give builders clear, usable marks and a straightforward handover.

Typical inclusions

  • Building corners and/or nominated wall lines marked in line with the plans.

  • Offset pegs and reference marks to allow reinstatement during excavation.

  • Gridlines or control lines where the design requires them.

  • Practical on-site handover, so the builder understands what each mark represents.

Set-Out vs Other Surveys

Survey TypeMain PurposeWhen It’s Commonly Used
Detail and contour surveyCaptures existing features and levels for design and approvals.Early planning and design.
Boundary / re-establishment surveyConfirms boundary position based on title and evidence.When boundaries are unclear or building close to a boundary.
Set out surveysMarks the building layout from plans onto the ground for construction.Before excavation/footings and at other key stages.

Ready to Book a Set-Out Survey in Sydney?

If your builder is ready to start, organising set-out early helps the site move forward with clear reference marks in place.

Send your plans, confirm your build stage, and book your set-out with East West Surveyors. You can enquire via the East West Surveyors Contact page.

Before we wrap up, here are some questions you might want answers for.

FAQs

1. What is a set out survey?

A set out survey marks the proposed building position on the ground from the nominated plans so construction can begin in the intended location.

2. What does set-out mean in construction?

Set-out is the process of transferring the building layout from drawings to physical marks on the site.

3. How much does a set out survey cost in Sydney?

Pricing depends on the footprint complexity, site conditions, and whether multiple set-out visits are required. Sharing plans and build stage is the quickest way to get an accurate quote.