Dual Occupancy Surveying in Bronte
East West Surveyors carried out construction set-out services for a dual occupancy development at 161 Macpherson St, Bronte NSW 2024.
The project was undertaken for LP Construction Group and included several set-out requirements relating to the residential construction works.
The recorded services included pile set-out, boundary and pile cap set-out, boundary and beam set-out, pier set-out and other specified set-out work.

Location
161 Macpherson St, Bronte NSW 2024
Project Type
Dual Occupancy
Development
Dual Occupancy Dwellings
Client
LP Construction Group
Property
Lots 13 & 14, DP 1287255
Surveyor
Warren Eldridge, Surveyor ID 993
Job Number
246902
Construction Set-Out for a Dual Occupancy Development
Dual occupancy construction requires accurate interpretation of the relevant plans and the transfer of specified positions to the site.
At 161 Macpherson St, Bronte, East West Surveyors provided set-out services for LP Construction Group as part of the residential development.
The recorded scope included pile set-out, boundary and pile cap set-out, boundary and beam set-out, pier set-out, and other specified set-out tasks.
Each set-out task relates to particular construction requirements. The applicable drawings and project instructions determine the positions to be established.
This project demonstrates the role of surveying in supporting the positioning requirements of residential construction.
Request a Quote
Set-Out Services for Residential Construction
The recorded surveying scope for the Bronte dual occupancy project included the following services.
- Set-out
- PILE-SET
- BS SET
- GF SET
- BDY & PILE CAP SET
- BDY & BEAM SET
- PIER SET
These service names follow the supplied project records. Abbreviations have been retained where their full meanings were not provided.
The precise scope of each service depends on the relevant construction drawings, survey instructions and project requirements.

Survey Support for Different Construction Elements
Set-out requirements vary according to the construction design and the elements being positioned on site.
Pile Set-Out
Set-out work associated with pile positions, based on the relevant project information and construction requirements.
BS Set
A recorded project service associated with the building set-out works. The abbreviation is retained as supplied in the project records.
GF Set
A recorded set-out service for the project. The exact scope should be confirmed against the original job documentation.
Boundary and Pile Cap Set-Out
Set-out work relating to boundaries and pile cap positions, using the applicable survey information and construction plans.
Boundary and Beam Set-Out
Set-out work associated with boundaries and beam positions for the relevant construction stage.
Pier Set-Out
Set-out work relating to pier positions for the development, based on the relevant construction information.
From Construction Plans to Site Set-Out
Set-out work helps transfer the positions specified in project information to the physical construction site.
01 | Reviewing Project Information
Understanding the Required Positions
The relevant construction drawings and survey instructions establish the positions that need to be set out. The requirements depend on the design and the particular construction stage.
- Relevant construction plans
- Required site positions
- Survey reference information
02 | Pile and Foundation-Related Set-Out
Positioning Specified Construction Elements
The supplied project scope includes PILE-SET, BDY & PILE CAP SET and PIER SET. These services relate to the positioning requirements identified in the relevant project information.
- PILE-SET
- BDY & PILE CAP SET
- PIER SET
03 | Boundary and Beam Set-Out
Supporting Building Position Requirements
Boundary and beam set-out forms part of the recorded surveying scope. The applicable drawings and project instructions determine the positions required for each task.
- BDY & BEAM SET
- Boundary-related set-out
- Specified beam positions
04 | Additional Set-Out Requirements
Addressing the Recorded Project Scope
The job record also includes BS SET, GF SET and general set-out services. Their exact scope should be confirmed against the original project documentation.
- BS SET
- GF SET
- Other recorded set-out work
Surveying Support for Dual Occupancy Construction
The Bronte project involved set-out services for a dual occupancy development at 161 Macpherson St.
East West Surveyors provided surveying services for LP Construction Group, with the recorded scope covering several construction set-out requirements.
The work included pile, boundary and pile cap, boundary and beam, and pier set-out, alongside other services listed in the project record.
The surveying requirements for another development may differ depending on the property, construction design and project instructions.
Project Details
Services for Similar Residential Projects
Boundary Identification
Understand property boundaries and relevant site information before planning or carrying out construction work.
Detail and Contour Survey
Capture relevant site features and levels to support design and development planning where required.
Construction Set-Out
Transfer specified construction positions from the relevant project plans to the site.
Dual Occupancy Surveying
What is a dual occupancy development?
A dual occupancy development generally involves two dwellings on one property, subject to the applicable planning controls and approvals. The specific arrangement and approval requirements depend on the site and proposed design.
Why is surveying important for dual occupancy construction?
Surveying helps establish required positions and reference points on site. Depending on the project, survey work may support boundary checks, building set-out, pile positioning and other construction requirements.
What is construction set-out?
Construction set-out transfers specified positions from project plans to the physical site. Builders and contractors use this survey information to identify the positions required for relevant construction work.
What is pile set-out?
Pile set-out identifies the required pile positions on site using the relevant construction plans and survey information. The scope and level of detail depend on the project's engineering and construction requirements.
What is pier set-out?
Pier set-out identifies the specified pier positions on site for construction. The surveyor works from the relevant design information and instructions for the project.
When should a surveyor be involved in a residential development?
A surveyor may be needed at different stages, from checking existing property information to setting out construction positions. The required services depend on the design, site conditions and project programme.
Construction Surveyors for Residential Projects in Bronte
East West Surveyors provides surveying services for residential construction and development projects across Sydney. Depending on the project requirements, services may include boundary identification, construction set-out and detail and contour surveying.

Planning a Dual Occupancy
Development in Sydney?
Discuss your residential construction project with East West Surveyors. Our team can review your requirements and help identify the surveying services suitable for your site and construction plans.