RESIDENTIAL PROJECT · BRONTE

Dual Occupancy Surveying in Bronte

East West Surveyors carried out construction set-out services for a dual occupancy development at 161 Macpherson St, Bronte NSW 2024.

The project was undertaken for LP Construction Group and included several set-out requirements relating to the residential construction works.

The recorded services included pile set-out, boundary and pile cap set-out, boundary and beam set-out, pier set-out and other specified set-out work.

Dual occupancy residential development at 161 Macpherson St, Bronte

Location

161 Macpherson St, Bronte NSW 2024

Project Type

Dual Occupancy

Development

Dual Occupancy Dwellings

Client

LP Construction Group

Property

Lots 13 & 14, DP 1287255

Surveyor

Warren Eldridge, Surveyor ID 993

Job Number

246902

The Project

Construction Set-Out for a Dual Occupancy Development

Dual occupancy construction requires accurate interpretation of the relevant plans and the transfer of specified positions to the site.

At 161 Macpherson St, Bronte, East West Surveyors provided set-out services for LP Construction Group as part of the residential development.

The recorded scope included pile set-out, boundary and pile cap set-out, boundary and beam set-out, pier set-out, and other specified set-out tasks.

Each set-out task relates to particular construction requirements. The applicable drawings and project instructions determine the positions to be established.

This project demonstrates the role of surveying in supporting the positioning requirements of residential construction.

Have a Similar Project?

Request a Quote

Quick Enquiry

We typically respond within one business day.

Surveying Services Completed

Set-Out Services for Residential Construction

The recorded surveying scope for the Bronte dual occupancy project included the following services.

  • Set-out
  • PILE-SET
  • BS SET
  • GF SET
  • BDY & PILE CAP SET
  • BDY & BEAM SET
  • PIER SET

These service names follow the supplied project records. Abbreviations have been retained where their full meanings were not provided.

The precise scope of each service depends on the relevant construction drawings, survey instructions and project requirements.

Surveying Requirements

Survey Support for Different Construction Elements

Set-out requirements vary according to the construction design and the elements being positioned on site.

Pile Set-Out

Set-out work associated with pile positions, based on the relevant project information and construction requirements.

BS Set

A recorded project service associated with the building set-out works. The abbreviation is retained as supplied in the project records.

GF Set

A recorded set-out service for the project. The exact scope should be confirmed against the original job documentation.

Boundary and Pile Cap Set-Out

Set-out work relating to boundaries and pile cap positions, using the applicable survey information and construction plans.

Boundary and Beam Set-Out

Set-out work associated with boundaries and beam positions for the relevant construction stage.

Pier Set-Out

Set-out work relating to pier positions for the development, based on the relevant construction information.

Construction Surveying

From Construction Plans to Site Set-Out

Set-out work helps transfer the positions specified in project information to the physical construction site.

01 | Reviewing Project Information

Understanding the Required Positions

The relevant construction drawings and survey instructions establish the positions that need to be set out. The requirements depend on the design and the particular construction stage.

  • Relevant construction plans
  • Required site positions
  • Survey reference information

02 | Pile and Foundation-Related Set-Out

Positioning Specified Construction Elements

The supplied project scope includes PILE-SET, BDY & PILE CAP SET and PIER SET. These services relate to the positioning requirements identified in the relevant project information.

  • PILE-SET
  • BDY & PILE CAP SET
  • PIER SET

03 | Boundary and Beam Set-Out

Supporting Building Position Requirements

Boundary and beam set-out forms part of the recorded surveying scope. The applicable drawings and project instructions determine the positions required for each task.

  • BDY & BEAM SET
  • Boundary-related set-out
  • Specified beam positions

04 | Additional Set-Out Requirements

Addressing the Recorded Project Scope

The job record also includes BS SET, GF SET and general set-out services. Their exact scope should be confirmed against the original project documentation.

  • BS SET
  • GF SET
  • Other recorded set-out work
Project Summary

Surveying Support for Dual Occupancy Construction

The Bronte project involved set-out services for a dual occupancy development at 161 Macpherson St.

East West Surveyors provided surveying services for LP Construction Group, with the recorded scope covering several construction set-out requirements.

The work included pile, boundary and pile cap, boundary and beam, and pier set-out, alongside other services listed in the project record.

The surveying requirements for another development may differ depending on the property, construction design and project instructions.

Project Details

ProjectBronte Dual Occupancy
ClientLP Construction Group
Address161 Macpherson St, Bronte NSW 2024
SurveyorWarren Eldridge
Surveyor ID993
Job Number246902
Property ReferenceLots 13 & 14, DP 1287255
Frequently Asked Questions

Dual Occupancy Surveying

What is a dual occupancy development?

A dual occupancy development generally involves two dwellings on one property, subject to the applicable planning controls and approvals. The specific arrangement and approval requirements depend on the site and proposed design.

Why is surveying important for dual occupancy construction?

Surveying helps establish required positions and reference points on site. Depending on the project, survey work may support boundary checks, building set-out, pile positioning and other construction requirements.

What is construction set-out?

Construction set-out transfers specified positions from project plans to the physical site. Builders and contractors use this survey information to identify the positions required for relevant construction work.

What is pile set-out?

Pile set-out identifies the required pile positions on site using the relevant construction plans and survey information. The scope and level of detail depend on the project's engineering and construction requirements.

What is pier set-out?

Pier set-out identifies the specified pier positions on site for construction. The surveyor works from the relevant design information and instructions for the project.

When should a surveyor be involved in a residential development?

A surveyor may be needed at different stages, from checking existing property information to setting out construction positions. The required services depend on the design, site conditions and project programme.

Local Connection

Construction Surveyors for Residential Projects in Bronte

East West Surveyors provides surveying services for residential construction and development projects across Sydney. Depending on the project requirements, services may include boundary identification, construction set-out and detail and contour surveying.

Construction Set-OutPile Set-OutBoundary Set-OutPile Cap Set-OutBeam Set-OutPier Set-OutResidential Development
Discuss your surveying requirements
EastWest Background

Planning a Dual Occupancy
Development in Sydney?

Discuss your residential construction project with East West Surveyors. Our team can review your requirements and help identify the surveying services suitable for your site and construction plans.